From bad to worse to WTF? Can we not buy a break on our remodel? Actually, another break or leak is what I am referring to. Yup, not one but TWO leaks that were found because of additional work we decided to undertake as prep work and painting continue on the second story.
I was detaching the vanities in the master bathroom and then pulled the baseboard off to reveal…more black mold on the back corner of my vanity! I knew my wife had a plumbing leak under her sink, which I fixed. We also saw my sink basin drain very slow, as if the P-trap were clogged or there was something impeding the draining of the water.
Not only was the wall wet, but the floor tiles as well as a substantial colony of black (and what looked like orange) mold that had been festering. So I did what I didn’t want to do, pulled off the drywall and plywood to reveal another crack in the recalled (Phoenix) ABS pipe.
I was horrified by what I saw, but not surprised. This was just one more example of the work done by KB Home by in 1989. I sure wish there was some further recourse for the continued plumbing issues we are having. I guess I will go after Lowe’s instead on their recalled drywall, for no less then $5000! I could always use more “free” money to continue fixing this “money pit” we call a home.
After about 45 minutes and $265 later the leak was fixed by John from American Plumbing. Now we were left with more patch work to do in the master bathroom, which wasn’t initially on the list of remodeling, since this was the first bathroom I redid when we first moved in. Needless to say, I had to rip up all the tile and re-patch the wall, which then got a skim coat of mud yesterday, textured and primed for painting on Monday.
Thankfully the end is now in sight. The new kitchen cabinets arrived yesterday and will be installed on Monday. The new recessed lights in the kitchen are now done as well. I also paid the painter to hang 5 doors and do all the trim/crown molding work since I have had enough of this remodel. With any luck we could be done with the house come early February.