Day 131
We are now well into our 4th month of remodeling from a leak that started back in April. I don’t think my wife or I initially expected repairs to last this long. What’s worse there seems to be new problems almost daily as I attempt to do work around the downstairs.
I had planned on removing and replacing all the decorative molding on the base of the walls, downstairs. So with my hammer and small crowbar I started removing the old molding yesterday in the living room in anticipation for prep and paint work. What did I find? More mold on the lower few inches behind the molding.
Today, I decided to dig a bit deeper and removed a 30 inch section under the window in the living room. Not only was the wall mold infested on the wood, insulation and wood, but there was also dry rot on some of the beams in the wall. All this under one window from years of moisture (above 20% from what I have read). It could be a leak, considering we have moisture in between the window panes.
So now, we have a decision to make. We cannot keep the window “as is” so that means we turn our attention to removing and replacing at least two windows, possibly three windows depending on what I find when I remove the remaining drywall from under the other windows.
On a high note, the kitchen is coming along nicely. We have the walls textured now and should be ready to paint tomorrow, which is wonderful. It is almost to my schedule I drew up at the end of last month. Unfortunately, there will be delays in prepping and painting the rest of the downstairs, as well as replacing the carpet. I am going to try and get new tile laid by the end of the month.
The inspector, on behalf of the mortgage company was out yesterday to take some photos and have me sign a paper saying the work is being completed and to release the remainder of the insurance money. Not sure what sort of time frame is involved, I am guessing two weeks, but will give B of A on Monday to see where we stand.
So I am evaluating what I am going to do from here on out. The cabinets should arrive next week if I am lucky, but lost my help who I had enlisted to assist me in putting them up. So there could be a 5-7 day delay in getting the cabinets in, which will delay everything else behind it.