Demolition Continues
I was finally able to get down to some actual work on the downstairs remodel this past week. I took an extra day off (Monday) in order to spend three days working on removing all our kitchen cabinets, as well as all the wood flooring and drywall in preparation for new Shenendoah cabinets we purchased at Lowe’s.
To this point, work had been rather slow. I had knocked down some drywall in the dining area, as well as the bathroom and torn up a portion of the wood floor. Needless to say, the wife was less than thrilled. I then purchased materials and started working on putting things back together. At one point we even had a temporary toilet in the downstairs bathroom, but it was taken out the other day.
So with a portion of our downstairs in some disarray I decided to take it all the way. With the blessing (I believe) from my wife, I started swinging the hammer and pulling off the cabinets. It was a great feeling to be getting rid of this old cabinets, as well as taking the kitchen all the way down to studs. This is really the only way it could have been done.
It has not been done without our fair share of problems. The first and most important problem, the lack of every day essentials we use. I was able to keep the microwave and stove close enough to their outlets IF we need them. I had intended on keeping the sink until our new one showed up, but that became impossible.
I say impossible because black mold was found (again) behind and next to the sink basin (on the lower walls). My wife had me stop demolition and call the insurance company, which I did. The adjuster was out there the next day, taking pictures and asking questions. It looks like we will get yet another pay out for the remodel. I can’t say for sure the water came from the original leak, but I can’t say it didn’t.
I hired a plumber to fix a broken pipe between the floors. Thankfully he was worth every penny, as he found two more leaks that, if not addressed would have resulted in even more damage if went unfixed. There was a crack found in the base of the pipe for the kitchen sink, as well as a crack in a pipe in my son’s bathroom, upstairs. Thankfully my procrastination didn’t cause more damage, as I had not hooked the sink up.
So here we are after three days with a 16 cubic yard dumpster…full, no cabinets in the kitchen and all the wood floor gone. I have started to hang new drywall and the tape/texture guy has started on areas I had already completed.
Now I got word our cabinets are running late…the saga continues.