We’re in the [Insurance] Money

Work as commenced on the house this past weekend. On my days off I started removing drywall in the dining room, pantry and the exterior of the bathroom. I have two more walls in the entry way to replace, but I am holding off on those because it will June 1 before the clean up company will start the mold remediation in the bathroom. Regardless of their work I plan on knocking all the walls out anyway, but won’t happen until next month.There are many things that need to happen before I hang all the drywall. I was able to fix the

Work as commenced on the house this past weekend. On my days off I started removing drywall in the dining room, pantry and the exterior of the bathroom. I have two more walls in the entry way to replace, but I am holding off on those because it will June 1 before the clean up company will start the mold remediation in the bathroom. Regardless of their work I plan on knocking all the walls out anyway, but won’t happen until next month.

There are many things that need to happen before I hang all the drywall. I was able to fix the leak in the HVAC system, but won’t attempt to tackle the plumbing issue. For that I need a plumber and I am still looking for one. I had hoped to get an estimate today from a general contractor who is local, but he needed to reschedule. I am hoping his company can replace the sliding glass door, replace all the wood flooring with tile, install the kitchen cabinets (and marble counter top) and probably a few other smaller items that I cannot remember at this time.

I still plan on doing ALL the demolition myself. Knowing how long it took me to knock down the drywall and rip up a portion of the wood floor I could have have most of the house devoid of old shit within 2 days. Unfortunately, the new carpet will be a bit slow because of moving belongings from room to room in order to lay the carpet will be a tedious process. But much like the drywall and kitchen cabinets I plan on pulling up all the carpet.

I had hoped to have a bit more done before my wife and son arrived home. But I need to get the plumbing in the ceiling fixed before I install the new drywall for the ceiling. This weekend is all but lost because of the CQWW WPX contest. Sunday might give me some time to work on the house depending on how close to 36 hours worked in the contest I am.

The leak is in the HVAC system, but won’t attempt to tackle the plumbing issue. For that I need a plumber and I am still looking for one. I had hoped to get an estimate today from a general contractor who is local, but he needed to reschedule. I am hoping his company can replace the sliding glass door, replace all the wood flooring with tile, install the kitchen cabinets (and marble counter top) and probably a few other smaller items that I cannot remember at this time.

I still plan on doing ALL the demolition myself. Knowing how long it took me to knock down the drywall and rip up a portion of the wood floor I could have have most of the house devoid of old shit within 2 days. Unfortunately, the new carpet will be a bit slow because of moving belongings from room to room in order to lay the carpet will be a tedious process. But much like the drywall and kitchen cabinets I plan on pulling up all the carpet.

I had hoped to have a bit more done before my wife and son arrived home. But I need to get the plumbing in the ceiling fixed before I install the new drywall for the ceiling. This weekend is all but lost because of the CQWW WPX contest. Sunday might give me some time to work on the house depending on how close to 36 hours worked in the contest I am.